Start / Reusable language
Ready to reuseuse when: drafting the Exceptions section and a verbatim block is wantedboilerplate blockmay be quotedchecked 2026-10-21

The accuracy of a savings estimate developed through engineering calculations depends on the extent to which the analysi

Cleared for reuse. Confirm the cited sources still say this before you paste it.

Status

Text

The accuracy of a savings estimate developed through engineering calculations depends on the extent to which the analysis is based on correct assumptions regarding such factors as usage patterns and operating hours. We assess assumed and actual baseline conditions by reviewing program baseline assumptions, verifying adequate supporting documentation, and testing the validity of those assumptions via interviews with participants and the findings from the verification effort. In our review of the calculation procedures used for different types of measures, we focus on the main factors that determine energy use.

Applicability

Sources