Start / Reusable language
Every reusable paragraph in the library, grouped by the section it belongs to. The number under each one is how many separate source documents the same language appeared in — the closest thing this corpus has to "how often we have said it".
Technical Approach 233 blocks
Engineering analysis includes those methods of analysis in which savings and load impacts are calculated by applying engineering principles and calculations.15 source documents
Direct power metering using Elite Pro power loggers, Wattnodes, Synergistics C-180, Enernet K-20, and DataTrap monitoring equipment;10 source documents
Verifying installations of measures through customer surveys, with follow up verification activities completed as part of the Impact Evaluation;9 source documents
In choosing which approach to specify for estimating savings for a particular program, we take account of several factors.7 source documents
with evaluation of the portfolio of programs, including desk reviews and custom analyzes using IPMVP Options A, B, and C.7 source documents
The set of observations should sufficiently characterize the building’s energy use such that reliable annual energy use values can be extrapolated;5 source documents
The panel model does not require a fixed participation window. Rather, each house essentially has its own, unique, participation window.5 source documents
and 173 more in this section
Past Performance 98 blocks
ADM has conducted numerous impact and process evaluations of energy efficiency and peak demand reduction programs for various clients. Examples include:10 source documents
Develop and design materials needed for workshops, reports, and case studies, for distribution to general and technical audiences;7 source documents
Our EM&V of these programs have included evaluation of load control, behavioral, and smart thermostat pilots, as well as authorship of the New Orleans TRM.5 source documents
We have conducted spot metering, short-term monitoring, and long-term monitoring using a variety of monitoring equipment and monitoring protocols.4 source documents
Assisted with evaluation of the portfolio of programs, including desk reviews and custom analyzes using IPMVP Options A,4 source documents
and 38 more in this section
Personnel Bio 65 blocks
Resumes detailing the education, background, recent experience, and specific technical accomplishments of each member of the project staff are provided in this Appendix.13 source documents
efficient. Directly supported the Project Manager and CTO using Excel, MySQL and Linux for data interpretation and review4 source documents
and 5 more in this section
Qualifications 59 blocks
Ecotype Consulting is a green design consulting company that specialized in LEED evaluation, California Title 24 compliance and building energy evaluations.6 source documents
Understanding Objectives 55 blocks
Building Energy Management Systems for data collection and data trending, to reduce the need for installation of sensors and logging equipment;9 source documents
Determining if the program has led to lasting changes in customer behavior regarding energy efficiency or influencing customer decision-making; and9 source documents
Help program designers and managers structure programs to achieve cost-effective savings while maintaining high levels of customer satisfaction;7 source documents
“If a financial incentive had not been available through the Program, how likely is it that you would have installed the measure anyway?”7 source documents
“Would you have gone ahead with this planned installation of the measure even if you had not participated in the Program?”7 source documents
Perceptions. How to customers perceive energy efficient appliances – do they see higher value and worth? Are they willing to pay more for energy efficiency?6 source documents
More recent work has also defined a Societal Cost Test, which is the same as the TRC test but with expanded definitions for benefits and costs.5 source documents
What are the key drivers of recommendation uptake? Are there customer characteristics that are indicative of higher uptake?5 source documents
study to assess the effect of survey mode (phone, web, and paper) on response rates and survey responses to a 2018 study4 source documents
Drawing on the information developed through the impact, process and cost effectiveness evaluations, we address the issues pertaining to program performance.4 source documents
Provide support for development of a portfolio tracking system capable of providing program and project data in a form required for evaluation purposes; and4 source documents
to develop a forecast model where internal sales data held by the credit card company could be used as a leading indicator4 source documents
Program, a large project with multiple partners to evaluate a program funding 41 grantees throughout the U.S. to implement4 source documents
more than 7,000 Oregon utility customers in to assess residential customer awareness of Energy Trust and its offerings as4 source documents
evaluation of the program, which educates over 3,000 customers annually on low-cost measures, practices, or behaviors to4 source documents
Review program documentation to evaluate if additional information should be collected in order to support future program evaluations.3 source documents
What percentage of the recycled appliances would have been permanently removed from the electric grid even in the absence of the program?3 source documents
offerings as well as energy-related attitudes and barriers to taking actions and how those relate to program participation3 source documents
Review program documentation and the documentation process to evaluate whether the process can be simplified and still achieve the same or superior impact.3 source documents
Avoided Cost Transmission & Distribution (T&D): This represents the amount of money [$/kWh] that would be saved through T&D of one less unit of energy.3 source documents
Avoided Cost of Natural Gas: This represents the amount of money [$/therm] that would be saved by avoiding the generation of one less unit of natural gas.3 source documents
Non-technical stakeholders include the subset of interested parties who are not necessarily well-informed regarding energy issues, energy policy, or the sciences.3 source documents
registering and maintaining eligibility for the program as well as the impact of the program on customers’ winter season3 source documents
Outside parties are given a forum to weigh in on key issues pertaining to energy efficiency, and perhaps advise or critique current program plans.3 source documents
Work Plan Tasks 45 blocks
Existing resources are redistributed across the programs to maximize their availability. Resource requirements are again summed across the programs to identify shortfalls.16 source documents
Installing field monitoring equipment, collecting data, and removing data collection equipment without interfering with the customers workflow; and7 source documents
Work with client staff to obtain copies of all program documentation and understand the intended purposes for the documentation.3 source documents
Task 5 is to conduct evaluations of program impacts. Our approach to the planning activities and the analysis were discussed above.3 source documents
To begin the work on Task 1, we review the requirements for the evaluation framework. As specified in the RFP, these requirements include the following:3 source documents
9 Most site visits will only require one to three hours of on-site work, but verifications of extensive projects in universities and3 source documents
Please provide a detailed project timeline according to your proposed tasks. Be prepared to walk through and discuss it.3 source documents
cost-benefit analysis, site-level M&V report writing and analysis, and participant satisfaction analysis using survey data.3 source documents
provide timely guidance, support, and solutions for any evaluation task that is straying from the required schedule or rate of activity3 source documents
After we have collected the data, we analyze the savings according to the guidelines and program-specific plans developed in Task 2.3 source documents
Sampling Analysis 39 blocks
Dei Supplier Diversity 34 blocks
Provide technical experts for hearings, workshops and other meetings, and prepare technical information for possible inclusion in meetings and reports;5 source documents
The baseline and post-installation average demands are calculated by dividing the total kWh usage during the peak period by the number of hours in the peak period4 source documents
We will report the number of retained customers in the analysis groups, after each step to identify issues or possible sources of bias.3 source documents
Staffing Organization 23 blocks
Where possible the shortfalls are redistributed across the projects to avoid delays and determine the FTE and PTE personnel and equipment requirements.13 source documents
Deliverables Schedule 23 blocks
Ensuring that project reporting is completed according to the specifications and schedule documented or referenced in the evaluation plan;5 source documents
Begin reporting early in the evaluation to stay on schedule and maintain the highest quality in all reporting deliverables.4 source documents
Please attach your company's formal proposal to this section including a detailed rate schedule for all consultants that will be working on this engagement.3 source documents
Pricing 20 blocks
Costs associated with the different approaches are different and therefore are also considered in choosing the savings estimation approach.8 source documents
In addition to the above, ADM provides the fastest consulting and advisory project feedback in the industry to help our clients mitigate risk and control costs.4 source documents
Trust of Oregon’s Fast Feedback process for collecting net-to-gross and satisfaction responses for all programs, from a 20094 source documents
Retail Rate: The average cost of energy saved [$/kWh] by the customer, including demand and energy charges. Differentiated by customer segment/rate class.3 source documents
Reporting 19 blocks
Project Management 17 blocks
Quality Assurance 14 blocks
We document any equipment changed or new equipment installed, including (1) descriptions, (2) schematics, (3) performance data, and (4) other supporting information.10 source documents
reproducibility of energy savings calculations, helping to mitigate the risk of errors in ex ante energy saving calculation and3 source documents
Exceptions 8 blocks
Determining whether the assumptions used were reasonable and appropriate including the persistence of the energy savings, and cost estimates;11 source documents
Other 4 blocks
International Performance Measurement and Verification Protocol. IPMVP Volume I: Concepts and Options for Determining Energy and Water Savings. 2007.6 source documents
exposure to race-based social stress affects biological mechanisms that may account for racial/ethnic disparities in health.3 source documents